CO129-508-8 Plans and reports on proposed aerodrome at Kai Tak 11-1-1928 - 21-12-1928 — Page 52

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All

Appendix VI (.1)

3.

1929 Draft Estimates.

Aerodrome Site.

Works.

Total.

Expenditure to 31.12.27.

Estimated Expenditure 1928.

Estimated Expenditure

1929.

(a) Resumptions..

1,186,250.00

$

1,001,250.00

$

&

$

90,000.00

95,000.00

(b) Forming of reclamation including completion of

sea walls, nullahs, surfacing and drainage.

738,000.00

12,599.09

380,000.00

*145,400.91

(c) Covering of Nullahs.....

275,000.00

43,957.13

110,000.00

121,044.87

(d) Slipways, filling in Camber area, extension of Nullah in Camber area and contingent works..

275,000.00

125,000.00

150,000.00

(e) Road..

55,000.00

55,000.00

Total

19

2,529,250.00 1,257,806.22

705,000.00

566,443.78

Less Contributions from Imperial Government,

(£190,000)..

989,783.00

692,783.00

297,000.00

Total

$

1,539,467.00

1,257,806.22

12,217.00

269,443.78

Note

-

Expenditure for 1928 and 1929 have been revised up to date and are therefore different from the

figures shewn in Draft Estimates 1929 page 110 Appendix VI (A) 3.

X

Of this amount about $25,000.00 may be required in 1930.

5th October, 1928.

50